# Smart electrical panels and custom SCADA systems

> A smart electrical panel uses an energy analyser and a communication module to measure consumption remotely, log it and send an SMS or email alert when something goes wrong. Databilim installs these panels and connects them to SCADA software built for your plant.

Monitor consumption and faults in your panels and the machines on your production line from one screen. We install the hardware on site and write the software for your plant.

## Smart electrical panels

With measurement and communication modules, in new panels or added to your existing ones, we make your electrical system remotely visible.

- Per-phase current, voltage and power measurement
- SMS / email alerts on faults and overload
- Remote on/off and scheduled circuits
- Monthly consumption report

## Custom SCADA systems

Monitoring and control software written around your plant instead of an off-the-shelf package. The screens show your machines in your terms.

- Modbus / OPC UA communication with PLCs, sensors and meters
- Live monitoring and alarm history on web and mobile
- Production, energy and downtime reports
- Runs on your own server or in a datacenter

## From field data to decisions on screen.

1. **Field – Panels and machines**: Meters, sensors, analysers
2. **Control – PLC and gateway**: Modbus, OPC UA, MQTT
3. **Server – SCADA server**: Data logging, alarms, backup
4. **You – Web and mobile dashboard**: Live view, reports, alerts

## Who it is for

- **Factories**: Line monitoring, downtime tracking, energy cost
- **Commercial buildings**: Consumption per floor and tenant
- **Water and agriculture**: Pumps, tank levels, irrigation
- **Public sector**: Lighting, facilities and stations

## Frequently asked questions

### Do we have to replace our existing panel?

In most cases, no. Measurement and communication modules can be added to the existing panel. We confirm this during the site visit.

### Where is the data stored?

On your own server or in our partner datacenter, as you prefer. Backups and access rights are part of the setup.

### How long does installation take?

[Enter the typical duration: e.g. X days for a single panel, X weeks for a SCADA project]

---

Databilim Teknoloji A.Ş. · https://databilim.com.tr/en/services/smart-electrical-panels
